Italy – 2018
Services: Architecture, Interior design
Building use: Hotel
Phase: Start 2018 – End March 2019
Refurbishment of one floor layout of Hotel Terme Apollo, for a total of 25 rooms. The architectural layout has been revised and the interior mood propose a modern interpretation of classical style elements. To create new junior suites was merged adjoining rooms, the partition of the rooms has been lightened by two high pocket doors. Materials and interior finishes design elegant and contemporary spaces. The mud and thermal waters suggested the color palette used for the rooms and common spaces.The design complexities consist to project new layout, in the middle of a hotel tower, that can coexist with the other using floors with different layout. The construction took only four months, during the seasonal closure of the hotel, which meant a research of quality materials with rapid installation method.